| Digging the pits for the waste material |
| Pumping the remaining water away |
| Long Armed Excavators begin removing silt and organic material |
| Shaping starts for the new 18th tee |
| This concrete drainpipe was replaced with a rigid plastic pipe |
| Sediment traps |
| Irrigation |
| Drainage |
| New 18th Tee takes shape |
| Pathway construction |
| Turfing the new tee |
No comments:
Post a Comment