Digging the pits for the waste material |
Pumping the remaining water away |
Long Armed Excavators begin removing silt and organic material |
Shaping starts for the new 18th tee |
This concrete drainpipe was replaced with a rigid plastic pipe |
Sediment traps |
Irrigation |
Drainage |
New 18th Tee takes shape |
Pathway construction |
Turfing the new tee |
No comments:
Post a Comment