Work on the new 15th tee continues after work stopped for two days due to bad weather and poor conditions. Installation of drainage and the construction of a new path started towards the new tee.





Drainage channels excavated
 


In goes the pipe and stone



With the pipe covered the stone carpet makes up another layer of the tee



Pathway excavated and ready for boarding. The valve box for the old tees irrigation is to be moved first.