The lake edge is in its final stage with the turfing be completed.
Sports Turf Maintenance including other construction projects and working procedures
Monday, 29 April 2013
Thursday, 25 April 2013
Tuesday, 23 April 2013
14th Bunker Refurbishment
The Refurbishment of two bunkers on the 14th started on Monday 22nd April. The bunkers will be reshaped and the base lined with AstroTurf.
The bunker on the fairway is having its face reduced and the mound rolled over, to what would have been its origninal shape.
The greenside bunker will be shaped and turned so that it is facing the green and not the 15th tee.
The bunker on the fairway is having its face reduced and the mound rolled over, to what would have been its origninal shape.
The greenside bunker will be shaped and turned so that it is facing the green and not the 15th tee.
![]() |
| fairway bunker |
![]() |
| Fairway bunker |
![]() |
| fairway bunker |
![]() |
| fairway bunker |
![]() |
| greenside bunker |
![]() |
| greenside bunker |
Friday, 19 April 2013
First time of 2013
The greens had there first cut on a weekend for 2013 today. A sure sign that summers on its way. It nearly didn't happen though as there was an early morning frost. Fortunately it cleared quickly off the greens. Bare a thought for the greenkeepers hands sitting on the mower!
Stump Grinding
15th Tee Update
Work progresses well on the 15th. The transplanted trees were fitted with wire guys to maintain stability. The rootzone layer has been applied to the tee and has had the first laser level pass. The new pathway has also been backfilled.
![]() |
| Wired Guy Supports |
![]() |
| Pathway takes shape |
![]() |
| Rootzone levelled after pass one |
![]() |
| Looking good |