Tuesday, 23 April 2013

14th Bunker Refurbishment

The Refurbishment of two bunkers on the 14th started on Monday 22nd April. The bunkers will be reshaped and the base lined with AstroTurf.
The bunker on the fairway is having its face reduced and the mound rolled over, to what would have been its origninal shape.
The greenside bunker will be shaped and turned so that it is facing the green and not the 15th tee.


fairway bunker


Fairway bunker



fairway bunker


fairway bunker





greenside bunker



greenside bunker


No comments:

Post a Comment