Thursday 27 March 2014

Greenside Repairs

Areas just off the greens which have taken a beating during the winter have received some TLC.

2nd


 Large areas have been turfed to remedy the winter damage and improve playing conditions. 

11th

One area that has been a concern for some time is the exit from the 18th green. A recognised high traffic area that has gradually deteriorated over many years, slowly eroding lower and lower. 


A natural low point that holds standing water. 



This year the low area has been raised to try and reduce the ongoing  erosion and improve presentation.



A drain that services the low area has remained and was adjusted.



The area was then finished with turf.







No comments:

Post a Comment