Thursday 13 March 2014

New 8th Tee Steps

Following the construction of a single larger tee on the 18th and a period of monitoring traffic; the new steps are being installed.







 A new technique is being tested using full width beams on the sides rather than slim boarding, to prolong the life of the steps, to improve strength and stability and reduce deterioration.









No comments:

Post a Comment