Thursday 27 March 2014

Machinery Paths

During the winter period the continuous traffic along recognised machinery paths created some heavily rutted areas. One of the worst areas affected was the machinery path that runs parallel to the 9th fairway.





A tractor mounted cultivator was used to loosen the dried soil and smooth it out, leaving a workable surface to seed and rake out level.

These areas are now marked GUR and will soon recover.

No comments:

Post a Comment